Digital PDFs
Documents
Guest
Register
Log In
EK-35XRN-IG-A01
November 1998
6 pages
Original
1.0MB
view
download
Document:
StorageWorks Rear SCSI Mount Kit
Order Number:
EK-35XRN-IG
Revision:
A01
Pages:
6
Original Filename:
OCR Text
Compaq StorageWorks Rear SCSI Mount Kit (DS–SW600–XB) This document describes how to install a rear SCSI shelf into an Enterprise Storage Array (ESA) 10000 cabinet using a rear SCSI mount kit (DS–SW600–XB). This shelf is capable of holding two hubs, two external cache batteries (ECB), and two power strips. This document also includes procedures for installing the hubs, ECBs, and power strips into the rear SCSI shelf. Table 1 Rack Mount Kit Parts List (Continued) Description Qty Locking Brackets (74–46439–01) 4 The three hubs that are compatible with this rack mount kit include DWZZH-03, -05, and -09. Warning Label 1 Power Cords: Black Gray 2 2 Qty SEMS Screws: 10-32 x 3/8 in Pan Head 10-32 x 5/8 in Pan Head 4 30 2 U-Nuts 26 Cable Ties 6 Push-Mount Cable Ties 8 Adhesive-Backed Cable Ties 6 Rack Mount Kit Contents Use Table 1 to verify that all mounting kit parts are available. Table 1 Rack Mount Kit Parts List Description Rear-Mount Shelf Support (70–33749–01) CXO6246A Note CXO6610A ECB Bracket (70–33750–01) 1 The number of cable ties provided in the mounting kit will secure all the power cords and ECB cables for shelf components. CXO6609A Compaq, the Compaq logo, and DIGITAL registered in United States Patent and Trademark Office. StorageWorks is a trademark of Compaq Computer Corporation. © 1998 Compaq Computer Corporation. All rights reserved. Printed in the U.S.A. EK–35XRN–IG. A01 November 1998 Preliminary Information Assembling a Rear SCSI Shelf The rear SCSI shelf rack mount installs in the rear of a ESA 1000 cabinet. Table 2 identifies: Complete the procedure in Table 3 to assemble a rear SCSI shelf. • Hole locations where u-nuts are required Table 3 • Cabinet rail holes for installing the upper and lower rear-mount shelf supports 1. Insert three u-nuts in holes 7, 8, and 9 on both the upper and lower rear-mount shelf supports. • Hole locations for connecting the ECB bracket to the upper and lower rear-mount shelf supports 2. Using four (10-32 x 5/8 in) screws, secure the two rear-mount shelf supports to the ECB bracket. Table 2 Bracket Mounting Holes Usage U-Nut/Mounting Hole Locations Upper rear-mount shelf support Cabinet rail holes 9, 10, and 11 from the bottom Lower rear-mount shelf support Cabinet rail holes 23, 24, and 25 from the bottom ECB Rear SCSI Shelf Assembly Procedure 3 2 1 Upper and lower rear-mount shelf support holes 7, 8, and 9 from the left or right Note CXO6607A 3. Turn the three bracket assembly over (upside-down), exposing the face of shelf. Count cabinet rail holes from the bottom to the top, beginning with hole 1. CXO6608A 4. 2 Using six (10-32 x 5/8 in) screws, secure the front of the ECB bracket to the upper and lower rear-mount shelf supports. Installing a Rear SCSI Shelf Table 4 Complete the procedure in Table 4 to install a rear SCSI shelf into an ESA 1000 cabinet. 7. Align the upper rear-mount shelf support holes with the u-nuts installed in the cabinet rail holes 23, 24, and 25, and secure the upper rear-mount shelf support with six (10-32 x 5/8 in) screws. If applicable, remove all cable ties securing cables that may interfere with installing the shelf in the cabinet. Ensure all power cords and data cables are clear of the shelf installation area. 8. Secure the lower rear-mount shelf support with six (10-32 x 5/8 in) screws. 9. Reconnect and secure any cabling affected in step 1. Bundle one black and one gray power cord together (leaving approximately 12 inches exposed at both ends) using an adhesive-backed cable tie. Affixing the Warning Label Table 4 1. 2. Rear SCSI Shelf Installation Procedure 3. Orient the cable bundle so that the female connector ends are directed toward the bottom of the cabinet and the male connector ends are directed toward the top of the cabinet. 4. Peel off the protective cover and attach the power cord bundle between the cabinet left inner and outer rails in the vicinity of rail holes 23 through 25. 5. Repeat steps 2 through 4 for the right side of the cabinet. Note Rear SCSI Shelf Installation Procedure (Continued) Affix the “Warning, High Leakage Current” label (CALLOUT 1) on the ECB bracket as shown in Figure 1. Ensure the text is positioned horizontally and readable from left to right. Figure 1 Label Placement 1 The two power cords going down the left side of the cabinet provide power to the left hub; those going down the right side of the cabinet provide power to the right hub. 6. Insert a u-nut in the following left and right cabinet rail holes, counting upward from the bottom: 9, 10, 11, 23, 24, and 25. CXO6601A Grounding the PDUs PDUs within the cabinet must be grounded to dissipate high-leakage current. Compaq recommends connecting a separate grounding wire from the PDU to an electrical ground outside the cabinet. WARNING! Secure a grounding wire to the rear of the PDU with the proper hardware. The end product user is responsible for meeting local and national electrical codes. CXO6600A 3 Installing a Hub Installing an ECB Complete the procedure in Table 5 to install a hub in a rear SCSI shelf. Complete the procedure in Table 6 to install an ECB in the rear SCSI shelf. Table 5 Table 6 1. Hub Installation Procedure Insert two u-nuts into holes 3 and 4 from the left side of the rear SCSI shelf upper rear-mount shelf support. 1. ECB Installation Procedure Insert the first ECB (primary) in the upper opening of the ECB bracket. 1 2 3 CXO6602A 2. 3. 4. 5. 6. Repeat step 1 using the lower rear-mount shelf support of the shelf. Orient the hub (CALLOUT 1) so that the power supplies are located on the top and facing outward. Slide the hub into the left-rear SCSI shelf opening until fully seated against the stop flange. Using two (10-32 x 5/8 in) screws, secure a locking bracket (CALLOUT 2) above the power supplies in the two center holes containing the u-nuts. Repeat step 5 for the other locking bracket (CALLOUT 3) installed below the hub devices. 7. Repeat steps 1 through 6 for the hub being inserted into the right-rear SCSI shelf opening. 8. Connect power cords to the hub power supplies using Table 7. Note The black cord connects to the top hub power supply (primary); the gray cord connects to the bottom hub power supply (redundant). 4 CXO6603A 2. Using a push-mount cable tie, attach the ECB cable going along the cabinet left side to the upper rear-mount shelf support by fastening the cable tie to the second hole from the left. 3. Insert the second ECB (redundant) in the lower opening of the ECB bracket. 4. Using a push-mount cable tie, attach the ECB cable going along the cabinet right side to the upper rear-mount shelf support by fastening the cable tie to the second hole from the right. 5. Connect the ECB cables to the appropriate ECBs (primary or redundant). Installing a Power Strip Table 7 Complete the procedure in Table 7 to install two power strips (primary and redundant) on a rear SCSI shelf. 4. Table 7 Power Strip Installation Procedure Power Strip Installation Procedure (Continued) Connect all power cords according to Figure 2. WARNING! Remove all power to the cabinet prior to installing the power strips. 1. Align the first power strip (primary; rear location) with the screw hole openings on the second raised rail—located on the top and rear SCSI shelf upper rear-mount shelf support. To prevent the possibility of injury or death as a result of electrical shock, always install the power cords exactly as shown in the Figure 2. Note To maintain power redundancy, never connect both power strips to the same PDU and never connect both hub power supplies to the same power strip. Black cords connect to the primary power strip and primary hub power supplies. Gray cords connect to the redundant power strip and redundant hub power supplies. Route power cords going from the power strips to the left hub along the left cabinet wall, down through the opening between the wall and rear SCSI shelf, and out to the front of the hub. For the right hub, route power cords the same way, but along the right wall. CXO6605A 2. Using two (10-32 x 3/8 in) screws, secure the power strip to the shelf. 3. Repeat steps 1 and 2 for the second power strip (redundant; front location) using the front raised rail on the upper rear-mount shelf support. 5 Figure 2 AC Wiring Schematic 1 2 3 4 11 5 6 ~ 7 11 8 9 10 ~ CXO6606A Figure CALLOUTS Legend 1. Primary power supply 2. 3. 4. 5. 6. Redundant power supply Left hub Right hub Gray cords Redundant power strip (front) 6 7. 8. 9. Redundant PDU (top) Black cords Primary power strip (rear) 10. Primary PDU (bottom) 11. Ground wire
Home
Privacy and Data
Site structure and layout ©2025 Majenko Technologies