Digital PDFs
Documents
Guest
Register
Log In
EK-35XHH-IG-A01
May 1997
2 pages
Original
0.1MB
view
download
Document:
StorageWorks Shelf Power Supply Installation Guide
Order Number:
EK-35XHH-IG
Revision:
A01
Pages:
2
Original Filename:
OCR Text
DIGITAL StorageWorks Shelf Power Supply Installation Guide This guide describes the procedures for removing and installing an ultra SCSI RAID 180 W shelf power supply (power controller) assembly, model DS–BA35X–HH. Removing a Power Supply Complete the following procedure to remove a power supply from the ultra SCSI RAID enclosure. 1. Disconnect the ac power cord from the supply. 2. Press the bezel mounting tabs together while pulling on the power supply. CXO-5112A-MC ____________ CAUTION ________________ To protect this sensitive electronic device from electrostatic discharge (ESD) use the following precautions—(1) Wear an ESD wrist strap. (2) Do not touch the printed circuit board or the backplane connector. (3) Do not lay the device on a work surface but place it on an electrostatic mat. (4) Place the device in an electrostatic bag for shipment. __________________________________________ CXO-4314A-MC 3. Remove the power supply from the enclosure. ______________ Note___________________ For detailed information about the operation, function, status, error conditions, fault conditions, and displays of this device, refer to the DIGITAL StorageWorks Ultra SCSI RAID Enclosure User’s Guide. __________________________________________ ™ StorageWorks and the DIGITAL logo are trademarks of Digital Equipment Corporation. ©Digital Equipment Corporation 1997 Printed in the U.S.A. All Rights Reserved. EK–35XHH–IG .A01 May 1997 Installing Shelf Power Supply Complete the following procedures to install a shelf power supply in an ultra SCSI RAID enclosure. 1. Remove the power supply from the electrostatic bag. Verify that the unit is a 180 W power supply by checking the label on the bezel. 2. Align the power supply with the slot in the enclosure. Power bus A Power bus B 4A 19 20 21 22 23 24 4B Shelf 4 3A 13 14 15 16 17 18 3B Shelf 3 2A 7 8 9 10 11 12 2B Shelf 2 1A 1 2 3 4 6 1B Shelf 1 A PVA EMU Controller A Controller B Cache A Cache B B 5 CXO5808A 3. Push the power supply in until the bezel mounting tabs engage the shelf. CXO-4314A-MC 4. Connect the ac power cord. 5. Check the ultra SCSI RAID system for proper operation 2
Home
Privacy and Data
Site structure and layout ©2025 Majenko Technologies