Digital PDFs
Documents
Guest
Register
Log In
EK-Z8ECB-IN-A01
May 2000
3 pages
Original
56.1kB
view
download
Document:
Installing an HSZ80 External Cache Battery (ECB)
Order Number:
EK-Z8ECB-IN
Revision:
A01
Pages:
3
Original Filename:
OCR Text
Installing an HSZ80 External Cache Battery (ECB) Follow these instructions to replace an ECB in a single controller or dual-redundant controller configuration. See the HSZ80 Array Controller ACS Version 8.x User’s Guide for instructions on upgrading a subsystem to a dual-redundant controller configuration. Replacing an External Cache Battery Storage Building Block in a DualRedundant Controller Configuration 3. Start FRUTIL with the following command: RUN FRUTIL 4. Follow these steps to replace an external cache battery (ECB) storage building block (SBB) (see Figure 1): Choose option 3, Replace other cache module battery, from the FRUTIL Main Menu: FRUTIL Main Menu: 1. Replace or remove a controller or cache module 2. Install a controller or cache module Figure 1. ECB for Dual-Redundant Configurations 3. Replace other cache module battery 4. Replace a PVA module 5. Replace an I/O module 1 6. Set battery life to new 2 7. Exit SH US STAT F OF UT E CH CA ER W PO Enter choice: 1, 2, 3, 4, 5, 6, or 7 -> 3 E CH CA ER W PO US STAT F OF UT SH 5. 4 3 Do you have a NEW replacement battery? Y/N 6. ~ 1 2 3 4 Shut off button Status LED ECB “Y” cable Faceplate and controls for second battery Confirm that you have a new dual-battery replacement ECB SBB. FRUTIL displays the following: Type Y(es) and press return. NOTE: If an empty slot is not available, place the new ECB SBB on the top of the cabinet. 7. Confirm that you want to install a replacement ECB SBB. FRUTIL displays the following: Replace the battery for the cache module in slot A CAUTION: Do not disconnect the old ECB until the batteries in the new ECB are fully charged. (or B)? Y/N 8. Type Y(es) and press return. NOTE: This procedure assumes that a single ECB SBB with a dual battery is installed and an empty slot is available for the replacement ECB SBB. If an empty slot is not available, place the new ECB SBB on the top of the cabinet. After the old ECB SBB has been removed, carefully insert the new ECB SBB into the empty slot. 9. Insert the new ECB SBB into an empty slot. 1. 10. Connect the open end of the ECB “Y” cable to the new ECB. 2. Connect a local terminal to the controller with the operational ECB. The controller to which you’re connected is “this controller;” the controller whose ECB you’re replacing is the “other controller.” Disable failover and take the controllers out of their dualredundant configuration with the following command: SET NOFAILOVER CAUTION: The ECB cable has a 12-V and a 5-V pin. Improper handling when connecting or disconnecting could cause these pins to contact ground, resulting in the cache module being shorted out. CAUTION: Do not disconnect the old ECB until the batteries in the new ECB are fully charged. The new ECB’s status light will be lit continuously to indicate that its batteries are fully charged. A blinking status light indicates that its batteries are charging. You may operate the subsystem regardless of the old ECB’s status. The DIGITAL logo is a trademark of Digital Equipment Corporation. © Digital Equipment Corporation 1998. All rights reserved. EK–Z8ECB–IN. A01 11. Wait until the new ECB’s status light is on continuously, then disconnect the ECB cable from the old ECB. CAUTION: Do not disconnect the old ECB until the batteries in the new ECB are fully charged. FRUTIL displays the following: 1. If the controller and cache module are not operating, go to step 4. Otherwise, go to the next step. 2. Connect a local terminal to the controller’s maintenance port. 3. Shut down the controller with the following command: Setting battery A (or B) state to new. Testing battery attached to cache module A (or B). Test complete. Battery is good. 12. Wait for FRUTIL to terminate. 13. Enable failover, and re-establish the dual-redundant configuration with the following command: SHUTDOWN THIS_CONTROLLER When the controller shuts down, its reset button and first three LEDs are lit continuously. SET FAILOVER COPY=THIS_CONTROLLER This command copies the subsystem’s configuration from “this controller” to the “other controller.” 14. Disconnect the local terminal from the controller and connect it to the other controller. 4. Turn off the power to the subsystem. 5. Insert the new ECB SBB into its slot. CAUTION: The ECB cable has a 12-V and a 5-V pin. Improper handling when connecting or disconnecting could cause these pins to contact ground, resulting in the cache module being shorted out. 15. To connect the other cache module to the new ECB SSB, repeat steps 2 through 8. Since the new ECB SBB is already installed, skip step 9, and then repeat steps 10 through 12. Now both cache modules are connected to the new ECB SSB. 16. Remove the old ECB SBB. NOTE: If an empty slot was not available, and the new ECB SBB was placed on the top of the cabinet, carefully insert it now into the empty slot. 6. Connect the open end of the ECB “Y” cable to the new ECB. 7. Restore power to the subsystem. The controller automatically restarts. CAUTION: Do not disconnect the old ECB until the batteries in the new ECB are fully charged. The new ECB’s status light will be lit continuously to indicate that its batteries are fully charged. A blinking status light indicates that its batteries are charging. You may operate the subsystem regardless of the old ECB’s battery status, but do not disconnect the old ECB until the batteries in the new ECB are fully charged. 17. Enable failover, and re-establish the dual-redundant configuration with the following command: SET FAILOVER COPY=THIS_CONTROLLER This command copies the subsystem’s configuration from “this controller” to the “other controller.” Replacing the External Cache Battery in a Single Controller Configuration 8. Wait until the new ECB’s status light is on continuously, then disconnect the ECB cable from the old ECB. 9. Start FRUTIL with the following command: RUN FRUTIL Follow these instructions to remove and replace a single-battery external cache battery (ECB) storage building block (SBB) (see Figure 2): 10. An internal clock monitors the life of the battery. When replacing a battery this clock must be reset. Choose option 6, Set battery life to new, from the FRUTIL Main Menu to reset the internal clock. Figure 2. ECB for Single Configurations FRUTIL Main Menu: 1. Replace or remove a controller or cache module 1 2. Install a controller or cache module 2 3. Replace other cache module battery 4. Replace a PVA module SH US STAT F OF UT E CH CA ER W PO 5. Replace an I/O module 6. Set battery life to new 7. Exit Enter choice: 1, 2, 3, 4, 5, 6, or 7 -> 6 3 ~ 1 2 3 Shut off button Status LED ECB “Y” cable 2 11. Choose option 1, Battery attached to cache module A, from the Battery Replacement menu: Which battery was replaced while powered off? 1. Battery attached to cache module A 2. Battery attached to cache module B 3. Both batteries 4. Exit Enter choice: 1, 2, 3, or 4 -> 1 FRUTIL displays the following: Setting battery A state to new. Testing battery attached to cache module A. Test complete. Battery is good. 12. Wait for FRUTIL to terminate. 13. Remove the old ECB SBB. 3
Home
Privacy and Data
Site structure and layout ©2025 Majenko Technologies