Digital PDFs
Documents
Guest
Register
Log In
EK-Z8CTL-IN-A01
May 2000
3 pages
Original
90.5kB
view
download
Document:
Installing an HSZ80 Array Controller
Order Number:
EK-Z8CTL-IN
Revision:
A01
Pages:
3
Original Filename:
OCR Text
Installing an HSZ80 Array Controller Follow these instructions to replace a controller in a single or dual-redundant controller configuration. See the HSZ80 Array Controller ACS Version 8.x User’s Guide for instructions on upgrading a subsystem to a dual-redundant controller configuration. 2. Figure 1. HSZ80 Array Controller 2 2x 3 1 3x 4 Disable failover and take the controllers out of their dualredundant controller configuration with the following command: SET NOFAILOVER 3. 5 Start FRUTIL with the following command: 6 RUN FRUTIL 1 2 3 4 5 6 4. 7 12 13 14 2x 8 11 Choose option 1, Replace or remove a controller or cache module, from the FRUTIL Main Menu: FRUTIL Main Menu: 9 1. Replace or remove a controller or cache module 2. Install a controller or cache module 3. Replace other cache module battery 10 CXO6330A 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Backplane connectors Host ports Program-card slot Program-card ejection button Program card ESD/PCMCIA card cover Trilink connector Host bus cable with ferrite bead SCSI terminator PC serial-port adapter Maintenance port cable Maintenance port Operator control panel (OCP) Lever for removing, installing, and retaining controller 4. Replace a PVA module 5. Replace an I/O module 6. Set battery life to new 7. Exit Enter choice: 1, 2, 3, 4, 5, 6, or 7 -> 1 5. Choose option 2, Other controller module, from the Replace or Remove Options menu to remove the “other controller:” Replace or remove Options: 1. Other controller and cache module 2. Other controller module 3. Other cache module 4. Exit Enter choice: 1, 2, 3, or 4 -> 2 6. Confirm that you want to remove the “other controller.” FRUTIL displays the following: Remove the slot B controller? Y/N Replacing a Controller in a DualRedundant Controller Configuration 7. Type Y(es) and press return. Follow these steps to replace a controller. 8. Wait for FRUTIL to quiesce the device ports. After the ports have been quiesced (this may take several minutes), FRUTIL displays the following: Removing a Controller in a Dual-Redundant Controller Configuration Follow these steps to remove a controller. 1. Connect a terminal to the operational controller’s maintenance port. The controller to which you’re connected is “this controller;” the controller that you’re removing is the “other controller.” All device ports quiesced. Remove the slot B controller (the one without a blinking green LED) See Figure 2 for location of the controller. The DIGITAL logo is a trademark of Digital Equipment Corporation. © Digital Equipment Corporation 1998. All rights reserved. EK–Z8CTL–IN. A01 Figure 2. Location of Controllers and Cache Modules FRUTIL Main Menu: 1. Replace or remove a controller or cache module EMU 2. Install a controller or cache module PVA 3. Replace other cache module battery Controller A 4. Replace a PVA module 5. Replace an I/O module Controller B Memory module A 6. Set battery life to new 7. Exit Memory module B Enter choice: 1, 2, 3, 4, 5, 6, or 7 -> 2 CXO6283A 4. NOTE: A countdown timer allows a total of two minutes to remove the controller. If you exceed the two minutes, “this controller” will exit FRUTIL and resume operations. Install Options: 1. Other controller and cache module 2. Other controller module 3. Other cache module CAUTION: An electrostatic discharge (ESD) can easily damage a controller or cache module. Wear an ESD wrist strap on your wrist, make sure the strap fits snugly, and attach the ESD strap's grounding lead to a verified earth ground. 9. Choose option 2, Other controller module, from the Install Options menu to install the “other controller:” 4. Exit Enter choice: 1, 2, 3, or 4 -> 2 5. Remove the ESD cover and program card. Save them for the new controller. Confirm that you want to install the “other controller.” FRUTIL displays the following: Insert the slot B controller? Y/N 10. Remove the trilink connectors from the “other controller” but don’t disconnect the bus cables (or terminators) from the trilink connectors. 6. Type Y(es) and press return. 7. Wait for FRUTIL to quiesce the device ports. After the ports have been quiesced (this may take several minutes), FRUTIL displays the following: NOTE: One or two trilink connectors may be attached, depending on the configuration. All device ports quiesced. Insert the controller module, without its program card, in slot B within x minutes, xx seconds. 11. Disengage the two retaining levers, and remove the “other controller,” and place the controller into an approved antistatic bag or onto a grounded antistatic mat. NOTE: A countdown timer allows a total of two minutes to install the controller. If you exceed the two minutes, “this controller” will exit FRUTIL and resume operations. 12. Once the controller is removed, FRUTIL displays the following: Restarting all device ports. Please wait... CAUTION: An electrostatic discharge (ESD) can easily damage a controller or cache module. Wear an ESD wrist strap on your wrist, make sure the strap fits snugly, and attach the ESD strap's grounding lead to a verified earth ground. . . . Do you have a replacement controller? Y/N Installing a Controller in a Dual-Redundant Controller Configuration Follow these steps to install a controller. 2. 9. Wait for FRUTIL to terminate. NOTE: One or two trilink connectors may be attached, depending on the configuration. Connect a terminal to the operational controller’s maintenance port. The controller to which you’re connected is “this controller;” the controller that you’re installing is the “other controller.” 11. Hold the reset button while inserting the program card into the new controller. Release the reset button and replace the ESD cover. Start FRUTIL with the following command: NOTE: This procedure assumes that a new controller is being installed. If the controller you’re installing was previously used in another subsystem, it will need to be purged of the controller’s old configuration. RUN FRUTIL 3. Ensure that the program card is NOT in the new controller and insert the new controller into its slot. Engage its retaining levers. 10. Connect the trilink connectors to the new controller. NOTE: If you selected Y(es) in step 12 in the removal procedure—for a continuous removal and installation—go to step 5. 1. 8. Choose option 2, Install a controller or cache module, from the FRUTIL Main Menu: 2 12. Enable failover, and re-establish the dual-redundant controller configuration with the following command: 9. SET FAILOVER COPY=THIS_CONTROLLER This command copies the subsystem’s configuration from “this controller” to the new controller. Installing the Controller in a Single Controller Configuration Follow these steps to install the controller. Replacing the Controller in a Single Controller Configuration CAUTION: An electrostatic discharge (ESD) can easily damage a controller. Wear an ESD wrist strap on your wrist, make sure the strap fits snugly, and attach the ESD strap’s grounding lead to a verified earth ground. Follow these steps to replace the controller. Removing the Controller in a Single Controller Configuration Follow these steps to remove the controller. 1. 2. 3. Make sure you align the controller and cache module in the appropriate card cage guide rails. If you do not align the modules appropriately, damage to the backplane can occur. From the host console, dismount the logical units in the subsystem. If you are using a Windows NT platform, shut down the PC. If the controller is operating, connect a terminal to the controller’s maintenance port. Run FMU to obtain the last failure codes, if desired. 1. Insert the new controller into its slot, and engage its retaining levers. 2. Connect the trilink connectors to the new controller. NOTE: One or two trilink connectors may be attached, depending on the configuration. If the controller is not operating, go to step 5. CAUTION: The cache module may contain data if the controller crashed and you weren’t able to shut it down with the SHUTDOWN THIS_CONTROLLER command. 3. Connect a terminal to the controller’s maintenance port. 4. Restore power to the subsystem. 5. Hold the reset button while inserting the program card into the new controller. Release and replace the ESD cover. If you won’t be installing a new controller within 24 hours, and if the cache module is still holding data, then restore the power to the subsystem after you’ve removed the failed controller. The cache module will hold its data as long as it receives power from the ECB. An ECB provides power for 24 hours or more depending on the amount of memory in the cache module. 4. If the controller you’re installing was previously used in another subsystem, it will restart with the configuration that resides in its nonvolatile memory. If this differs from the subsystem’s current configuration, you can purge the controller’s old configuration with the following command: SET THIS_CONTROLLER INITIAL_CONFIGURATION Shut down the controller with the following command: The controller shuts down after returning to its initial configuration. Press its reset button to restart the controller after the controller has been configured. SHUTDOWN THIS_CONTROLLER When the controller shuts down, its reset button and the first three LEDs are lit continuously. 5. If INITIALIZE container-name SAVE_CONFIGURATION was used to save the controller’s configuration, you can restore the configuration by using the CONFIGURATION RESTORE command. Turn off the power to the subsystem. CAUTION: An electrostatic discharge (ESD) can easily damage a controller. Wear an ESD wrist strap on your wrist, make sure the strap fits snugly, and attach the ESD strap's grounding lead to a verified earth ground. 6. 7. 6. Using CLCP, install any patches that you had installed on the previous controller as described in the HSZ80 Array Controller ACS Version 8.x User’s Guide. Remove the ESD cover and program card. Save them for the new controller. 7. Mount the logical units on the host. (If you are using a Windows NT platform, restart the PC.) Remove the trilink connectors, but don’t disconnect the bus cables (or terminators) from the trilink connectors. 8. Set the subsystem date and time. NOTE: One or two trilink connectors may be attached, depending on the configuration. 8. Disengage the two retaining levers and remove the controller, then place the controller into an approved antistatic bag or onto a grounded antistatic mat. If connected, disconnect the terminal from the controller’s maintenance port. 3
Home
Privacy and Data
Site structure and layout ©2025 Majenko Technologies