Digital PDFs
Documents
Guest
Register
Log In
EK-356MA-IG-A01
January 1998
62 pages
Original
0.7MB
view
download
Document:
StorageWorks SCSI Controller Shelf Upgrade/Add-On Kits Installation Guide
Order Number:
EK-356MA-IG
Revision:
A01
Pages:
62
Original Filename:
OCR Text
DIGITAL StorageWorks SCSI Controller Shelf Upgrade/Add-On Kits Installation Guide Part Number: EK–356MA–IG. A01 January 1998 This publication describes the DS–BA356–MD Series array controller shelf installation procedures. The first portion of this publication addresses shelf upgrade kit procedures and the last portion addresses shelf add-on kit procedures. Digital Equipment Corporation Maynard, Massachusetts January 1998 Digital Equipment Corporation makes no representations that the use of its products in the manner described in this publication will not infringe upon existing or future patent rights, nor do the descriptions contained in this publication imply the granting of licenses to make, use, or sell equipment or software in accordance with the description. Possession, use, or copying of the software described in this publication is authorized only pursuant to a valid written license from DIGITAL or an authorized sublicensor. © Digital Equipment Corporation 1998. All rights reserved. Note This equipment generates, uses, and may emit radio frequency energy. The equipment has been type tested and found to comply with the limits for a Class A digital device pursuant to Part 15 of the FCC rules, which are designed to provide reasonable protection against such radio frequency interference. Operation of this equipment in a residential area may cause interference, in which case, the user, at his own expense, will be required to take whatever measures may be required to correct the interference. Any changes or modifications made to this equipment may void the users’s authority to operate this equipment. This equipment generates, uses, and can radiate radio frequency energy and, if not installed and used in accordance with the instructions, may cause harmful interference to radio communications. However, there is no guarantee that interference will not occur in a particular installation. If this equipment does cause harmful interference to radio or television reception, which can be determined by turning the equipment off and on, the user is encouraged to try to correct the interference by one or more of the following measures: • Reorient or relocate the receiving antenna. • Increase the separation between the equipment and receiver. • Connect the equipment into an outlet on a circuit different from that to which the receiver is connected. • Consult the dealer or an experienced radio/TV technician for help. DIGITAL, StorageWorks, and the DIGITAL logo are trademarks of Digital Equipment Corporation. Table of Contents Preface Intended Audience........................................................................................................................ ix Structure ....................................................................................................................................... ix Chapter 1—Introduction ................................................................................................ix Chapter 2—Removing a Controller Shelf .....................................................................ix Chapter 3—Installing a Replacement Shelf ...................................................................ix Chapter 4—Installing an Add-On Controller Shelf .......................................................ix Documentation Conventions ......................................................................................................... x Related Documents ...................................................................................................................... xi 1 Introduction Required Tools and Equipment................................................................................................. 1-1 Inventory List ............................................................................................................................ 1-2 Controller Shelf Orientation...................................................................................................... 1-5 Unpacking the Box.................................................................................................................... 1-6 2 Removing a Controller Shelf Replacement Check List............................................................................................................ 2-1 New Shelf Orientation............................................................................................................... 2-2 Identifying Shelf Components .................................................................................................. 2-2 Preliminary Procedure............................................................................................................... 2-4 Power Supplies.......................................................................................................................... 2-4 iii Table of Contents (Continued) Removing the Power Supplies................................................................................................... 2-5 Removing the I/O Cable Panel and Cables................................................................................ 2-6 Removing the Shelf ................................................................................................................... 2-8 3 Installing a Replacement Shelf Installing the Shelf ..................................................................................................................... 3-2 Installing the I/O Cables ............................................................................................................ 3-4 Installing the Cache and Controllers.......................................................................................... 3-6 Horizontal Mount Orientation ............................................................................................ 3-7 Front Vertical Mount Orientation....................................................................................... 3-7 Rear Vertical Mount Orientation........................................................................................ 3-7 Completing the Installation........................................................................................................ 3-8 4 Installing an Add-On Controller Shelf Preliminary Check List .............................................................................................................. 4-1 Installing a Screw-Mounted Bracket (Vertical Mount Only) .................................................... 4-4 Installing a Shelf Using Tab-Mounted Brackets ....................................................................... 4-9 Installing the I/O Cables .......................................................................................................... 4-15 Installing the Cache and Controllers........................................................................................ 4-16 Horizontal Mount Orientation .......................................................................................... 4-17 Front Vertical Mount Orientation..................................................................................... 4-17 Rear Vertical Mount Orientation...................................................................................... 4-17 Completing the Installation...................................................................................................... 4-18 iv List of Figures Figure 1-1 Controller Shelf Orientations ...........................................................................................1-5 Figure 2-1 Typical Shelf Components ..............................................................................................2-3 Figure 2-2 Shelf Components ............................................................................................................2-5 Figure 2-3 I/O Cable Panel Removal ................................................................................................2-6 Figure 2-4 I/O Cable Numbering ......................................................................................................2-7 Figure 2-5 Removal of Front Shelf Locking Brackets ......................................................................2-8 Figure 2-6 Shelf Removal .................................................................................................................2-9 Figure 2-7 Top and Bottom Front-Mounted Shelf Stop Bracket Positions .....................................2-10 Figure 2-8 Rear-Mounted Shelf Stop Bracket Position ...................................................................2-11 Figure 3-1 Inserting the Shelf in the Cabinet ....................................................................................3-2 Figure 3-2 Front Shelf Locking Brackets ..........................................................................................3-3 Figure 3-3 Rear Shelf Locking Brackets ...........................................................................................3-3 Figure 3-4 Installing the Top and Bottom Shelf Locking Brackets ..................................................3-3 Figure 3-5 I/O Cable Installation .......................................................................................................3-5 Figure 3-6 Controller Shelf Orientations ...........................................................................................3-6 Figure 3-7 Completed DS–BA356–MD Shelf Configuration ...........................................................3-9 Figure 4-1 Two-Piece Horizontal Cabinet Bracket ...........................................................................4-2 Figure 4-2 One-Piece Horizontal Cabinet Bracket ............................................................................4-3 Figure 4-3 Stop Brackets Showing Stop Positions 4 and 5 ...............................................................4-4 Figure 4-4 Screw-Mounted Bracket with Slot 4 ................................................................................4-5 Figure 4-5 Vertical Mount Orientations ............................................................................................4-6 Figure 4-6 Inserting a Shelf into a Cabinet .......................................................................................4-7 Figure 4-7 Front Locking Bracket .....................................................................................................4-7 Figure 4-8 Rear Locking Bracket ......................................................................................................4-7 Figure 4-9 Installing the Top and Bottom Shelf Locking Brackets ..................................................4-8 Figure 4-10 Stop Brackets Showing Stop Positions 4 and 5 .............................................................4-9 Figure 4-11 Vertical Mounting—Tab-Mounted Cabinet Bracket ...................................................4-10 Figure 4-12 Horizontal Mounting—Tab-Mounted Bracket with Slot 4 .........................................4-11 v List of Figures (Continued) Figure 4-13 Controller Shelf Mount Orientations .......................................................................... 4-12 Figure 4-14 Inserting a Shelf into a Cabinet ................................................................................... 4-13 Figure 4-15 Front Locking Bracket ................................................................................................ 4-13 Figure 4-16 Rear Locking Bracket ................................................................................................. 4-13 Figure 4-17 Installing the Top and Bottom Shelf Locking Brackets .............................................. 4-14 Figure 4-18 I/O Cable Installation .................................................................................................. 4-15 Figure 4-19 Controller Shelf Orientations ...................................................................................... 4-16 Figure 4-20 Completed DS–BA356–MD Shelf Configuration ...................................................... 4-19 vi List of Tables Table 1-1 Tools & Equipment ..........................................................................................................1-1 Table 1-2 SCSI Controller Shelf Upgrade/Add-On Kits Components ...........................................1-2 Table 1-3 SCSI Controller Shelf Add-On Kit (DS–BA356–MD) Components ..............................1-2 Table 1-4 User Ordered SCSI Controller Shelf Components ..........................................................1-3 Table 1-5 BN21H Series Single-Ended 50-Conductor Cables .........................................................1-4 vii Preface The DIGITAL StorageWorks SCSI Controller Shelf Installation Guide describes the replacement of an older model shelf and the installation of an add-on controller shelf. Intended Audience This publication is for use by DIGITAL™ StorageWorks™ small computer system interface (SCSI) controller shelf customers and employees who are responsible for installing, replacing, and configuring controller shelves and their components. Structure This manual is organized as follows: Chapter 1—Introduction Presents the critical issues that must be addressed: replacing shelves, unpacking the shelves, the required tools, and general information. Chapter 2—Removing a Controller Shelf Describes the processes for removing an existing shelf and applies only to upgrade kits. Chapter 3—Installing a Replacement Shelf Describes the procedures for installing a replacement shelf and applies only to upgrade kits. Chapter 4—Installing an Add-On Controller Shelf Describes the steps required to install an add-on controller shelf. ix Preface Documentation Conventions The documentation conventions used in this publication are shown in Table 1. Table 1 Documentation Conventions boldface type Boldface type indicates the first instance of terms being defined in the text, the glossary, or both. italic type Italic type indicates emphasis and publication titles. A/R As required. The light emitting diode (LED) is ON or blinking slowly. The LED is OFF. The LED is FLASHING (blinking rapidly). Warning The information is essential to the safety of personnel. Caution The information is essential in order to avoid damaging the software or hardware. Note Notes contain information that might be of special interest to the user. Single-ended SCSI bus. Differential SCSI bus. x Preface Related Documents Table 2 identifies publications that contain additional information relevant to DS–BA356–MD SCSI controller shelves. Table 2 Relevant Publications Publication Title Part Number SCSI Controller Shelf Upgrade/Add-On Kits Check List EK–356M1–RM SCSI Controller Shelf Upgrade/Add-On Kits User’s Guide EK–356MA–UG 16-Bit SBB User’s Guide EK–SBB16–UG SBB Shelf I/O Module User’s Guide EK–SBBIO–UG SW500 and SW800 Cabinet Metric Shelf Bracket Kit Installation Guide EK–35XRD–IG Using Your Controller in a BA356 Controller Shelf EK–HSMXM1–CG HSZ70 Array Controller HSOF CLI Reference Manual EK–CLI70–RM HSZ70 Array Controller Configuration Manual EK–HSZ70–CG HSZ70 Array Controller Service Manual EK–HSZ70–SV HSZ70 Family Array Controller Operating Software (HSOF) Software Product Description SPD 64.81.00 Array Controller HSZ70 Operating Software HSOF Release Notes EK–HSZ70–RN Getting Started–HSZ70 Solutions Software for ... platform AA–R60xx–TE Polycenter Console Manager See the Getting Started guide listed above for the platform-specific order number. Getting Started with Command Console AA–R0HJC–TE The RAIDBOOK—A Source for RAID Technology RAID Advisory Board xi 1 Introduction This chapter contains information regarding the tools and materials required to remove and install DIGITAL StorageWorks DS–BA356–MD controller shelves. It also identifies controller shelf orientations and information relevant to unpacking controller shelf shipping boxes. Required Tools and Equipment Table 1-1 identifies the tools and equipment required for removal and installation of controller shelves. Table 1-1 Tools & Equipment Required Items Diagonal cutters Needle-nosed pliers 5/16-inch Nut driver Straight-slot screwdriver #2 Phillips screwdriver Electrostatic Discharge (ESD) mat ESD wrist strap Knife or cutting tool SCSI Controller Shelf Upgrade/Add-On Kits Installation Guide 1-1 Introduction Inventory List Table 1-2 lists the controller shelf components required to install the DS–SWXM1–AA or DS–SWXM1–BA as an upgrade or add-on kit. Table 1-3 lists the controller shelf components required to install the DS–BA356–MD as an add-on kit. Table 1-4 lists user special order components. Table 1-2 SCSI Controller Shelf Upgrade/Add-On Kits Components DS–SWXM1 Model Number Description –AA –BA DS–BA356–MD Controller shelf (see Table 1-3) 1 1 DS–HSZ70–AH StorageWorks Input/Output (I/O) Controller with: 64 MB cache memory ECB cable installation kit 1 2 DS–HS35X–BC Single ECB 1 0 DS–HS35X–BD Dual ECB 0 1 Table 1-3 SCSI Controller Shelf Add-On Kit (DS–BA356–MD) Components Description Qty DS–BA356–MD controller shelf with: 150 W power supplies (BA35X–HF) Blower assembly (BA35X–MQ) 1 2 2 50-conductor 2m (6.6 feet) cable (BN21H–02) 1 Cache module blank panel 1 Controller module blank panel 1 Metric shelf bracket, screw mounting (74–46442–01) and Screws (10-32 x 0.625 inch) 2 12 1-2 SCSI Controller Shelf Upgrade/Add-On Kits Installation Guide Introduction Description Qty 1 2 8 2 2 2 2 Metric shelf mounting kit (BA35X–RD) with: Tab mounting bracket (74–47506–01) Kep nuts Locking bracket, front shelf (74–46441–02) Locking bracket, rear shelf (74–46441–01) Stop bracket (74–46439–01) Stop bracket screws Note The components listed in Table 1-4 are only required for use with the DS–BA356–MD SCSI controller shelf add-on kit. Table 1-4 User Ordered SCSI Controller Shelf Components Description Qty Model DIGITAL array controller with cache memory A/R Contact your account representative Single ECB 1 per cache DS–HS35X–BC Dual ECB 1 per 2 caches DS–HS35X–BD ECB cable 1 per cache Contact your account representative Fast 10 SCSI cables A/R BN21H series ECB shelf A/R DS–BA35X–BA Operating system specific platform kit 1 per controller Contact your account representative SCSI Controller Shelf Upgrade/Add-On Kits Installation Guide 1-3 Introduction Table 1-5 provides a description of the SCSI cable that might be included in the shelf package purchased. Table 1-5 BN21H Series Single-Ended 50-Conductor Cables Length Cable Description 50-conductor cable with: 2 each, 50-pin, high-density, male, straight connector with thumb latches Order Number Meters Feet 0.3 1.0 BN21H–0C 0.5 1.6 BN21H–0E 1.0 3.3 BN21H–01 1.5 4.9 BN21H–1E 2.0 6.6 BN21H–02 StorageWorks CONNECTOR 1-4 SCSI Controller Shelf Upgrade/Add-On Kits Installation Guide CXO-4165A-MC_R Introduction Controller Shelf Orientation There are various shelf orientations available: • Shelves can be mounted horizontally or vertically in the cabinets. The current cabinet configuration determines the shelf orientation. When replacing a BA350–M series shelf with a DS–BA356–M series shelf, use the same orientation for the new shelf as for the previous shelf. • For a horizontal orientation, only tab-mounted brackets are used. • For a vertical orientation, either tab-mounted or screw-mounted brackets may be used. The type is determined by the cabinet into which the shelf is being mounted. The three typical shelf-mounting orientations are: horizontal, front-vertical, and rear-vertical. Figure 1-1 depicts each orientation. Vertical Mount (Typical Cabinet Front) Cache module B Horizontal Mount (Front or Rear) I/O module Controller A Controller B CXO6239A Power supply Controller B Controller A I/O module Cache module B Cache module A Cache module A Power supply Cache module A I/O module Controller A Controller B Cache module B Power supply Power supply Figure 1-1 Controller Shelf Orientations Power supply Power supply CXO6237A CXO6238A Vertical Mount (Typical Cabinet Rear) SCSI Controller Shelf Upgrade/Add-On Kits Installation Guide 1-5 Introduction Unpacking the Box Complete the following procedure to remove the shelf from the box: 1. Use an ESD-compliant work surface. Warning Two people are required to remove the shelf from the box—one person holds the box while the other pulls out the shelf. Use proper lifting techniques when lifting the shelf. Failure to do so might cause personal injury. 2. One person holds the box securely while the other person removes its contents. 3. Grasp the shelf with both hands, bending at the knees as the shelf is lifted out of the box. 4. When the shelf clears the box, place it on the ESD compliant work surface. Note As the components are removed from the packaging, check them against the inventory list. 5. Carefully unwrap the components, ensuring that they are all placed entirely on the ESD-compliant work surface. 6. Remove the controller shelf from the ESD bag, placing the controller shelf on top the bag. 7. Remove the bubble-wrapped mounting brackets and bag of screws, the BA35X–RD box, and the cache and controller cards. 1-6 SCSI Controller Shelf Upgrade/Add-On Kits Installation Guide Introduction 8. Open the BA35X–RD box and check its contents against the parts list in the SW500 and SW800 Cabinet Metric Shelf Bracket Kit Installation Guide. Note If any parts are missing, contact your account representative. 9. After all parts, tools, and materials are accounted for: • If you are REPLACING a controller shelf with an upgrade kit, then go to Chapter 2—Removing a Controller Shelf. • If you are INSTALLING an add-on controller shelf, then go to Chapter 4—Installing an Add-On Controller Shelf. 10. If necessary, retain packaging for future use in packing old materials. Caution Do NOT attempt to install the controller shelf in the cabinet without ensuring the cabinet and new shelf are properly grounded. Ensure you wear an ESD wrist strap that is properly grounded to the cabinet. Otherwise, damage to the controller might occur due to an electrical static discharge. SCSI Controller Shelf Upgrade/Add-On Kits Installation Guide 1-7 2 Removing a Controller Shelf Chapter 2 applies only if you are installing a controller shelf (DS–SWXM1–AA or DS–SWXM1–BA) as an upgrade kit. If installing as an add-on kit, go to Chapter 4. Chapter 2 covers the removal of your BA350–M controller shelf in preparation for installing the DS–BA356–MD controller shelf as an upgrade kit. Replacement Check List Caution Before you begin to remove a controller shelf, refer to the SCSI Controller Shelf Upgrade/Add-On Kits Check List document. This document was initially placed on the outside of the DS–BA356–MD shelf packing box and printed on bright yellow paper stock. It is extremely important to follow this document in the exact order as the information is presented. Otherwise, loss of data and damage to might occur. Do NOT continue with this chapter until all of the objectives prior to the removal and installation steps on the SCSI Controller Shelf Upgrade/Add-On Kits Check List are complete. After removing, reading, and accomplishing all the tasks in the SCSI Controller Shelf Upgrade/Add-On Kits Check List, proceed with the removal of the controller shelf. SCSI Controller Shelf Upgrade/Add-On Kits Installation Guide 2-1 Removing a Controller Shelf New Shelf Orientation Shelves can be mounted horizontally or vertically in the cabinets as shown in Chapter 1, Figure 1-1. Your cabinet’s current configuration determines the shelf orientation required for this upgrade kit installation. Identifying Shelf Components Figure 2-1 identifies all the pertinent components of a typical shelf configuration: (1) Top and bottom front shelf locking brackets (2) Power supplies (3) Controller cache module A (4) Array controller module A (5) Controller cache module B (6) Array controller module B (7) Host port adapter cables (8) ECB cables (9) I/O cables (10) I/O cable panel (11) Power supply cords 2-2 SCSI Controller Shelf Upgrade/Add-On Kits Installation Guide Removing a Controller Shelf Figure 2-1 Typical Shelf Components 1 2 11 10 3 9 4 5 6 8 7 1 CXO6092A SCSI Controller Shelf Upgrade/Add-On Kits Installation Guide 2-3 Removing a Controller Shelf Preliminary Procedure Complete the following procedure before removing a controller shelf: Warning Do NOT slide hands along cabinet rail edges. The rails are very sharp and might cause personal injury. Caution Proper ESD procedures must be followed: • Use an ESD work surface. • Wear a properly grounded ESD wrist strap. • Place all components on the ESD work surface as you remove them from the packaging. 1. On the host system, dismount the subsystem disk drives connected to the controllers being replaced. 2. Attach your ESD wrist strap to an unpainted surface on the cabinet, such as a mounting rail. 3. Quiesce all the controller SCSI buses on the controllers being replaced. 4. Remove power from the SBB shelves connected to the controller shelf being replaced. Power Supplies Two power supplies are provided with each SCSI controller shelf upgrade or add-on kit and should be used with the new controller shelf. However, the power supplies from your BA350–M shelf may be used with the DS–BA356–MD controller shelf, provided they are rated at least 150 W, such as the BA35X–HF. If desired, remove the power supplies from the controller shelf to provide more working room and lighten the weight of the shelf for removal. 2-4 SCSI Controller Shelf Upgrade/Add-On Kits Installation Guide Removing a Controller Shelf Removing the Power Supplies Removing the power supplies from the BA350–M shelf is a simple process. Refer to Figure 2-2 as necessary while completing the following procedure: Figure 2-2 Shelf Components 1 2 11 10 3 4 9 5 6 8 7 1 CXO6092A 1. Disconnect the two power supply cords (11) from the power supplies. All power supply and controller LEDs turn off and the blowers stop operating. 2. Remove the power supplies (2) by pressing the squeeze tabs and pulling on the power supplies until they are free of the shelf. 3. Reserve the power supplies for future use. SCSI Controller Shelf Upgrade/Add-On Kits Installation Guide 2-5 Removing a Controller Shelf Removing the I/O Cable Panel and Cables Refer to Figure 2-2 while completing the following procedure for removing the I/O cable panel (10) and cables. Label each cable as it is removed. 1. If ECBs are present, disconnect the ECB cables (8). 2. Disconnect the host port cable adapters (7). 3. Cut any cable ties that might interfere with the removal and replacement of the shelf. 4. Remove the I/O cable panel, as shown in Figure 2-3, by unscrewing the top and bottom screws located on the panel. Figure 2-3 I/O Cable Panel Removal 1 2 3 4 5 6 1 2 3 4 5 6 CXO6093A 2-6 SCSI Controller Shelf Upgrade/Add-On Kits Installation Guide Removing a Controller Shelf Note The Cache A and Controller A modules may be removed to give easier access to the I/O cables. 5. Use tape to sequentially number the cables from top to bottom, as shown in Figure 2-4. Note Sequential numbering is important because when the cables are reconnected on the new shelf, they are connected to the port but in reverse sequence. 4 3 2 1 Figure 2-4 I/O Cable Numbering CXO6094A 6. Starting with the most accessible cable, disconnect each cable by depressing the squeeze tabs on the ends of the cables. SCSI Controller Shelf Upgrade/Add-On Kits Installation Guide 2-7 Removing a Controller Shelf Removing the Shelf Controller shelf components can be removed at this time to lighten the weight of the controller shelf. Complete the following procedure to remove a vertical shelf: 1. Remove the top and bottom front shelf lock brackets as shown in Figure 2-5. These brackets might be mounted with Kep nuts or screws. Remove Kep nuts using a 5/16-inch nut driver; remove screws with a #2 Phillips screwdriver. Figure 2-5 Removal of Front Shelf Locking Brackets 1 2 3 4 5 6 CXO6095A 2. Save the Kep nuts or screws for the new shelf installation. 3. Grasp the controller shelf at the top and the bottom. 2-8 SCSI Controller Shelf Upgrade/Add-On Kits Installation Guide Removing a Controller Shelf Note Before removing the shelf, note its orientation by referencing the power supply position (top or bottom). When the new shelf is installed, it will need to be inserted with the same orientation in order for all the components to connect correctly. 4. Remove the controller shelf by gently rocking the shelf from side to side or up and down while pulling outward (see Figure 2-6). Figure 2-6 Shelf Removal CXO6096A 5. Put the original controller shelf in an ESD bag. SCSI Controller Shelf Upgrade/Add-On Kits Installation Guide 2-9 Removing a Controller Shelf 6. For front-mounted shelves: remove the stop brackets from the upper and lower shelf mounting brackets, exposing only stop position 5 (see Figure 2-7). Figure 2-7 Top and Bottom Front-Mounted Shelf Stop Bracket Positions Stop position 5 Upper shelf mounting bracket Stop position 5 Lower shelf mounting bracket CXO6097A 2-10 SCSI Controller Shelf Upgrade/Add-On Kits Installation Guide Removing a Controller Shelf 7. For rear-mounted shelves: if necessary, install a rear stop bracket in stop position #4 as shown in Figure 2-8. Figure 2-8 Rear-Mounted Shelf Stop Bracket Position Stop position #4 Mounting bracket CXO6211A 8. You are now ready to install the new DS–BA356–MD controller shelf. Go to Chapter 3. SCSI Controller Shelf Upgrade/Add-On Kits Installation Guide 2-11 3 Installing a Replacement Shelf Chapter 3 applies only if you are installing a controller shelf (DS–SWXM1–AA or DS–SWXM1–BA) as an upgrade kit. If installing as an add-on kit, go to Chapter 4. This chapter covers the instructions for installing a DS–BA356–MD controller shelf as an upgrade kit. Warning Do NOT slide hands along cabinet rail edges. The rails are very sharp and might cause personal injury. SCSI Controller Shelf Upgrade/Add-On Kits Installation Guide 3-1 Installing a Replacement Shelf Installing the Shelf Complete the following procedure to install a replacement shelf: 1. Ensure that the power cords and data cables are clear of the controller slot. Note Install the replacement shelf using the same orientation and slot as the original shelf. The location of the power supplies in the original shelf determines how the new shelf is inserted. (See Chapter 1, Figure 1-1 for typical shelf mounting orientations.) 2. Insert the shelf as shown in Figure 3-1, using a gentle rocking motion—up and down, front and back. Figure 3-1 Inserting the Shelf in the Cabinet CXO6098A 3-2 SCSI Controller Shelf Upgrade/Add-On Kits Installation Guide Installing a Replacement Shelf 3. Ensure the shelf is firmly seated to the rear. 4. Using the shelf locking brackets provided, install them onto the shelf mounting brackets using either Kep nuts for tab-mounted brackets or screws for screw-mounted brackets. See Figure 3-2 and Figure 3-3 for shelf locking bracket examples. Figure 3-4 illustrates the installation of shelf locking brackets on a tab-mounted bracket. Figure 3-2 Front Shelf Locking Brackets CXO6214A Figure 3-3 Rear Shelf Locking Brackets CXO6212A Figure 3-4 Installing the Top and Bottom Shelf Locking Brackets 1 2 3 4 5 6 CXO6095A SCSI Controller Shelf Upgrade/Add-On Kits Installation Guide 3-3 Installing a Replacement Shelf Installing the I/O Cables Complete the following procedure to install the I/O cables: Caution To prevent damage to the controller or SBB, the I/O cables must be connected to SBB shelf prior to power application. Note Ensure that access to the modules is not impeded in any way by the cabling. If the one meter cable (BN21H–01) is too short for connecting the BA356 I/O module, replace it with the two meter cable provided (BN21H–02). 1. Install the numbered I/O cables on the appropriate side of the shelf, as shown in Figure 3-5. Connect them in reverse sequence, for example, beginning with #6, then #5, #4, #3, #2, and #1. 3-4 SCSI Controller Shelf Upgrade/Add-On Kits Installation Guide Installing a Replacement Shelf Figure 3-5 I/O Cable Installation 1 2 3 4 CXO6100A 2. Ensure that the cables are firmly seated in the connectors. SCSI Controller Shelf Upgrade/Add-On Kits Installation Guide 3-5 Installing a Replacement Shelf Installing the Cache and Controllers Use the appropriate shelf mounting orientation (see Figure 3-6) and its accompanying procedure to install the cache and controllers as the following describes: Vertical Mount (Typical Cabinet Front) Cache module B I/O module Controller A Controller B CXO6239A Horizontal Mount (Front or Rear) Power supply Controller B Controller A I/O module Cache module B Cache module A Cache module A Power supply Cache module A I/O module Controller A Controller B Cache module B Power supply Power supply Figure 3-6 Controller Shelf Orientations Power supply Power supply CXO6237A CXO6238A Vertical Mount (Typical Cabinet Rear) Note It is easier to install both cache modules before installing the controllers. If there is only one cache, install a blank panel over the Cache B slot. If there is only one controller, install a blank panel over the Controller B slot. 3-6 SCSI Controller Shelf Upgrade/Add-On Kits Installation Guide Installing a Replacement Shelf Horizontal Mount Orientation Complete the following procedure using Figure 3-6 to install shelf components: 1. Install the cache A module in the bottom, left cache slot next to the power supplies. 2. Install cache B or blank panel to the right of cache A. 3. Install controller A in the slot immediately below the I/O module. 4. Install controller B or blank panel immediately below controller A. Front Vertical Mount Orientation Complete the following procedure using Figure 3-6 to install shelf components: 1. Install the cache A module in the top, left cache slot under the power supplies. 2. Install cache B or blank panel under cache A. 3. Install controller A or blank panel in the slot immediately to the left of the I/O module. 4. Install controller B or blank panel immediately to the left of controller A. Rear Vertical Mount Orientation Complete the following procedure using Figure 3-6 to install shelf components: 1. Install the cache A module in the bottom, right cache slot above the power supplies. 2. Install cache B or blank panel immediately above cache A. 3. Install controller A in the slot immediately to the right of the I/O module. 4. Install controller B or blank panel immediately to the right of controller A. SCSI Controller Shelf Upgrade/Add-On Kits Installation Guide 3-7 Installing a Replacement Shelf Completing the Installation Complete the following procedure to finish installing the DS–BA356–MD controller shelf upgrade kit: 1. Install and connect the ECB and cables using the SCSI Controller Shelf Upgrade/Add-On Kits User’s Guide. 2. Install the host port cables using the appropriate array controller documentation. Caution Connecting the first power cord in the next step applies power to the shelf. 3. Connect the power supplies in both the SBB shelves and the controller shelf: the black cord to the power supply next to the locking bracket and the grey cord to the power supply next to the controller. The green status LEDs on the power supplies turn on and the blowers start operating. 4. Dress the cables with tie wraps, ensuring that the cables do not interfere with the removal of any modules. 5. Figure 3-7 is an example of a completed DS–BA356–MD shelf configuration that includes: (1) Top and bottom front shelf locking brackets (2) Power supplies (3) Array controller module A (4) Array controller module B (5) Host port adapter cables (6) ECB cables (7) Controller cache module A (8) Controller cache module B (9) Power supply cords 3-8 SCSI Controller Shelf Upgrade/Add-On Kits Installation Guide Installing a Replacement Shelf Figure 3-7 Completed DS–BA356–MD Shelf Configuration 1 2 9 6 3 4 8 7 6 5 1 CXO6103A 6. Pack the old shelf components for disposition. 7. Setup and test the controller shelf using procedures in the appropriate array controller configuration guide. You are finished with installing the controller shelf. Return to the SCSI Controller Shelf Upgrade/Add-On Kits Check List and continue. SCSI Controller Shelf Upgrade/Add-On Kits Installation Guide 3-9 4 Installing an Add-On Controller Shelf Chapter 4 applies only if you are installing a controller shelf (DS–SWXM1–AA, DS–SWXM1–BA, or DS–BA356–MD) as an add-on kit. If installing the DS–SWXM1–AA or DS–SWXM1–BA as an upgrade kit, go to Chapter 2. Chapter 4 covers the installation of the DS–BA356–MD controller shelf and its components as an add-on kit. Preliminary Check List Complete the following preliminary procedure for pertinent information regarding your installation: Warning Do NOT slide hands along cabinet rail edges. The rails are very sharp and might cause personal injury. 1. Consult your DIGITAL cabinet guide for supported configurations. 2. Determine the slot in which to put the shelf. 3. For all horizontal slots, use the tab-mounted brackets located within the BA35X–RD box. SCSI Controller Shelf Upgrade/Add-On Shelf Installation Guide 4-1 Installing an Add-On Controller Shelf 4. If the cabinet has a two-piece horizontal cabinet bracket as shown in Figure 4-1, screw-mounted brackets must be used. Go to the section in this chapter for installing screw-mounted brackets. Figure 4-1 Two-Piece Horizontal Cabinet Bracket Vertical cabinet rails Two-piece horizontal cabinet bracket CXO4288B 4-2 SCSI Controller Shelf Upgrade/Add-On Shelf Installation Guide Installing an Add-On Controller Shelf 5. If the cabinet has a one-piece cabinet bracket as shown in Figure 4-2, tab-mounted brackets must be used. Go to the section for installing tab-mounted brackets. Figure 4-2 One-Piece Horizontal Cabinet Bracket Vertical cabinet rails One-piece horizontal cabinet bracket CXO4289B SCSI Controller Shelf Upgrade/Add-On Shelf Installation Guide 4-3 Installing an Add-On Controller Shelf Installing a Screw-Mounted Bracket (Vertical Mount Only) Complete the following procedure to install a vertical screw-mounted bracket: 1. Make sure the power cords and data cables are clear of the controller slot. 2. Determine the correct stop bracket position for the shelf type being installed. • For a front shelf installation, the stop bracket is part of the mounting bracket and uses stop position 5. • For a rear shelf installation, secure a stop bracket to both mounting brackets in stop position 4 with a screw (see Figure 4-3). Figure 4-3 Stop Brackets Showing Stop Positions 4 and 5 Stop position #4 Stop position #5 Stop bracket 4-4 SCSI Controller Shelf Upgrade/Add-On Shelf Installation Guide Installing an Add-On Controller Shelf 3. Install the mounting bracket: • Position the first mounting bracket at the correct mounting holes just behind the outer flange of the horizontal cabinet rail (see Figure 4-4). Figure 4-4 Screw-Mounted Bracket with Slot 4 Screw Stop position #4 Stop bracket Stop position #5 Shelf mounting bracket Locking bracket Screw Vertical cabinet rails Horizontal cabinet bracket CXO6248A 4. • Fasten the mounting bracket to the outer flange of the cabinet rail with two screws, using the left-most and right-most holes (see Figure 4-4). • Fasten the mounting bracket to the inner horizontal cabinet bracket with two screws. Repeat steps 2 and 3 for the other mounting bracket. SCSI Controller Shelf Upgrade/Add-On Shelf Installation Guide 4-5 Installing an Add-On Controller Shelf Note Shelf orientation is determined by the shelf location (front or rear). 5. Orient the shelf as determined by the location of the power cords within the vertical mount slot opening as as show in Figure 4-5: I/O module Controller A Controller B Controller B Controller A I/O module Cache module B Cache module A Power supply Cache module A Power supply Cache module B Figure 4-5 Vertical Mount Orientations Power supply Power supply CXO6237A Vertical Mount (Typical Cabinet front) 4-6 SCSI Controller Shelf Upgrade/Add-On Shelf Installation Guide CXO6238A Vertical Mount (Typical Cabinet Rear) Installing an Add-On Controller Shelf 6. Gently slide the shelf into the mounting brackets as shown in Figure 4-6 and fully seat it against the stop brackets. Figure 4-6 Inserting a Shelf into a Cabinet CXO6098A 7. Based upon the shelf location (front or rear), select the two appropriate locking brackets for use: • For a front-mounted shelf, use locking bracket number 74–46441–02 (shown in Figure 4-7). Figure 4-7 Front Locking Bracket CXO6214A • For a rear-mounted shelf, use locking bracket number 74–46441–01 (shown in Figure 4-8). Figure 4-8 Rear Locking Bracket CXO6212A SCSI Controller Shelf Upgrade/Add-On Shelf Installation Guide 4-7 Installing an Add-On Controller Shelf 8. Position the appropriate locking bracket over the middle two holes and finger tighten two screws to secure the bracket. Figure 4-9 shows Kep nuts where the screws are located on screw-mounted brackets. Figure 4-9 Installing the Top and Bottom Shelf Locking Brackets 1 2 3 4 5 6 CXO6095A 9. Firmly push the locking bracket against the shelf to seat it. 10. Tighten the two screws. 11. Repeat steps 8 through 10 for the other locking bracket. 4-8 SCSI Controller Shelf Upgrade/Add-On Shelf Installation Guide Installing an Add-On Controller Shelf Installing a Shelf Using Tab-Mounted Brackets Complete the following procedure to install a shelf using tab-mounted brackets: 1. Ensure that the power cords and data cables are clear of the controller slot. 2. Determine the correct stop bracket position for the shelf type being installed. • For a front shelf installation, use stop position 5, which is part of the mounting bracket. • For a rear shelf installation, secure a stop bracket to both mounting brackets in stop position 4 with a screw as shown in Figure 4-10. Figure 4-10 Stop Brackets Showing Stop Positions 4 and 5 Stop position #4 Stop position #5 Stop bracket SCSI Controller Shelf Upgrade/Add-On Shelf Installation Guide 4-9 Installing an Add-On Controller Shelf 3. Install the mounting bracket: • Position the first mounting bracket behind the outer flange and against the horizontal cabinet bracket for vertical mounting as shown in Figure 4-11 or against the vertical rail for horizontal mounting as shown in Figure 4-12. Figure 4-11 Vertical Mounting—Tab-Mounted Cabinet Bracket THRL 10-32 TRS .500 XRCS screw Stop position #4 Stop bracket Stop position #5 Mounting stud (4 places) Shelf mounting bracket (lower position) Mounting tab (4 places) Shelf locking bracket M5 kep nut (4 places) Horizontal cabinet bracket Vertical cabinet rails CXO4075B 4-10 SCSI Controller Shelf Upgrade/Add-On Shelf Installation Guide Installing an Add-On Controller Shelf Figure 4-12 Horizontal Mounting—Tab-Mounted Bracket with Slot 4 Stop position #4 Mounting tab Rear vertical cabinet rail Locking bracket Mounting bracket Kep nut, M5 Mounting stud CXO6211A 4. • Ensure that the mounting studs align with the rail mounting holes. • Slide the mounting bracket forward to seat the studs and tabs, ensuring that the cables are not pinched in the process. • Install the Kep nuts on the outer studs and fully tighten them. Repeat steps 2 and 3 for the other mounting bracket, ensuring that the second bracket aligns with the first bracket. SCSI Controller Shelf Upgrade/Add-On Shelf Installation Guide 4-11 Installing an Add-On Controller Shelf Note Shelf orientation is determined by the shelf location (front or rear). 5. Orient the shelf as determined by the location of the power cords within the slot opening (see Figure 4-13): • Horizontal mount: cords are on the left, orientation is the same for front and rear. • Vertical mounts: if the cords are at the top, orient using typical cabinet front, or if the cords are at the bottom, orient using typical cabinet rear. Vertical Mount (Typical Cabinet Front) Cache module B I/O module Controller A Controller B CXO6239A Horizontal Mount (Front or Rear) Power supply Controller B Controller A I/O module Cache module B Cache module A Cache module A Power supply Cache module A I/O module Controller A Controller B Cache module B Power supply Power supply Figure 4-13 Controller Shelf Mount Orientations Power supply Power supply CXO6237A CXO6238A Vertical Mount (Typical Cabinet Rear) 4-12 SCSI Controller Shelf Upgrade/Add-On Shelf Installation Guide Installing an Add-On Controller Shelf 6. Gently slide the shelf into the mounting brackets as shown in Figure 4-14 and fully seat it against the stop brackets. Figure 4-14 Inserting a Shelf into a Cabinet CXO6098A 7. Based upon the shelf location (front or rear), select the two appropriate locking brackets for use: • For a front-mounted shelf, use locking bracket number 74–46441–02 (see Figure 4-15). Figure 4-15 Front Locking Bracket CXO6214A • For a rear-mounted shelf, use locking bracket number 74–46441–01 (see Figure 4-16). Figure 4-16 Rear Locking Bracket CXO6212A SCSI Controller Shelf Upgrade/Add-On Shelf Installation Guide 4-13 Installing an Add-On Controller Shelf 8. Position the two shelf locking brackets over the two center studs on the shelf mounting brackets as shown in Figure 4-17. Figure 4-17 Installing the Top and Bottom Shelf Locking Brackets 1 2 3 4 5 6 CXO6095A 9. Finger-tighten two Kep nuts to secure one of the brackets. 10. Firmly push this locking bracket against the shelf to seat it. 11. Tighten the two Kep nuts for this locking bracket. 12. Repeat steps 9 through 11 for the other locking bracket. 4-14 SCSI Controller Shelf Upgrade/Add-On Shelf Installation Guide Installing an Add-On Controller Shelf Installing the I/O Cables Complete the following procedure to install the I/O cables: Caution To prevent damage to the controller or to the SBBs, the I/O cables must be connected to SBB shelf prior to power application. 1. Install the I/O cables on the appropriate side of the shelf for your shelf’s orientation, as illustrated in Figure 4-18. Figure 4-18 I/O Cable Installation 1 2 3 4 CXO6100A 2. Ensure that the cables are firmly seated in the connectors. SCSI Controller Shelf Upgrade/Add-On Shelf Installation Guide 4-15 Installing an Add-On Controller Shelf Installing the Cache and Controllers Use the appropriate shelf mounting orientation (see Figure 4-19) and its accompanying procedure to install the cache and controllers as the following describes: Vertical Mount (Typical Cabinet Front) Cache module B I/O module Controller A Controller B CXO6239A Horizontal Mount (Front or Rear) Power supply Controller B Controller A I/O module Cache module B Cache module A Cache module A Power supply Cache module A I/O module Controller A Controller B Cache module B Power supply Power supply Figure 4-19 Controller Shelf Orientations Power supply Power supply CXO6237A CXO6238A Vertical Mount (Typical Cabinet Rear) Note It is easier to install both cache modules before installing the controllers. If there is only one cache, install a blank panel over the Cache B slot. If there is only one controller, install a blank panel over the Controller B slot. 4-16 SCSI Controller Shelf Upgrade/Add-On Shelf Installation Guide Installing an Add-On Controller Shelf Horizontal Mount Orientation Complete the following procedure using Figure 4-19 to install shelf components: 1. Install the cache A module in the bottom, left cache slot next to the power supplies. 2. Install cache B or blank panel to the right of cache A. 3. Install controller A in the slot immediately below the I/O module. 4. Install controller B or blank panel immediately below controller A. Front Vertical Mount Orientation Complete the following procedure using Figure 4-19 to install shelf components: 1. Install the cache A module in the top, left cache slot under the power supplies. 2. Install cache B or blank panel under cache A. 3. Install controller A in the slot immediately to the left of the I/O module. 4. Install controller B or blank panel immediately to the left of controller A. Rear Vertical Mount Orientation Complete the following procedure using Figure 4-19 to install shelf components: 1. Install the cache A module in the bottom, right cache slot above the power supplies. 2. Install cache B or blank panel immediately above cache A. 3. Install controller A in the slot immediately to the right of the I/O module. 4. Install controller B or blank panel immediately to the right of controller A. SCSI Controller Shelf Upgrade/Add-On Shelf Installation Guide 4-17 Installing an Add-On Controller Shelf Completing the Installation Complete the following procedure to finish installing the DS–BA356–MD controller shelf add-on kit: 1. Install and connect the ECB and cables using the SCSI Controller Shelf Upgrade/Add-On Kits User’s Guide. 2. Install the host port cables using the appropriate array controller documentation. Caution Connecting the first power cord in the next step applies power to the shelf. 3. Connect the power supplies in both the SBB shelves and the controller shelf: the black cord to the power supply next to the locking bracket and the grey cord to the power supply next to the controller. The green status LEDs on the power supplies turn on and the blowers start operating. 4. Dress the cables with tie wraps, ensuring that the cables do not interfere with the removal of any modules. 5. Figure 4-20 is an example of a completed DS–BA356–MD shelf configuration that includes: (1) Top and bottom front shelf locking brackets (2) Power supplies (3) Array controller module A (4) Array controller module B (5) Host port adapter cables (6) ECB cables (7) Controller cache module A (8) Controller cache module B (9) Power supply cords 4-18 SCSI Controller Shelf Upgrade/Add-On Shelf Installation Guide Installing an Add-On Controller Shelf Figure 4-20 Completed DS–BA356–MD Shelf Configuration 1 2 9 6 3 4 8 7 6 5 1 CXO6103A 6. Pack the old shelf components for disposition. 7. Setup and test the controller shelf using procedures in the appropriate array controller configuration guide. You are finished with installing the controller shelf. SCSI Controller Shelf Upgrade/Add-On Shelf Installation Guide 4-19
Home
Privacy and Data
Site structure and layout ©2025 Majenko Technologies