Digital PDFs
Documents
Guest
Register
Log In
XX-D1498-DA
2000
7 pages
Original
0.3MB
view
download
OCR Version
0.2MB
view
download
Document:
05
Order Number:
XX-D1498-DA
Revision:
0
Pages:
7
Original Filename:
05.pdf
OCR Text
PDP~X Technical‘Memorandum H# 2 Title: Specifications Author (s) : Index Keys: L. Seligman H. Burkhardt Design 10 Peripherals Specifications Distribution Keys s ' Obsolete: None Revision: None ‘Date: June 27, 1967 PDP-X Technical Memorandum # 5 In order to facilitate of optional It is this the equipment, (Continued) manufacture, certain responsibility of specification before the the checkout specifications design design and engineer is maintenance are required. to write considered complete. The required format is attached; minor deviations are perm%551ble if required by the natuze of the option. ciCl( ~ }fflThe spec1rlcatlons will be cc;s:&v d as w11l all subsequent e changes. The suggested letrlbutlon list is A, B, D. W PDP-X TechniéaliMemorandum 4 5 (Continued) 0. Overall Description A description of basic operating philosophy, major functional components, programming considerations, etc. This is intended to serve as an introduction and should be brief, i = E . . . : - % General Specifications | The;detaiiedAperférmance and construction-specification of the unit. Includes:s . 1.1 Definifiion of 5asic systefi 1.2 IList of included opfions 1.3 Mechanical packaging 1.4 Environmental Specification, 1.5 General performance including power required specification. Specification of Vendor-supplied equipment Includes pruchase specification and general performance description. 3. Programming The programming-specification of the unit including: 3.1 Listing and deécription of all instructions 3.2 Description of special maintenance instrucfions 3.3 Description of dataAforméts 3.4 Timing diagrams 3.5 Description of all operator controls 3.6 Meanihg of all status bits and a suitable drawing of 3.7 the status Programming of signals word. examples. availlable to the programmer PDP-X Technical Memorandum # 5 4. (Contihued) 1Installation Data An installation procedure Includes any special outlets, etc. This subassembly 1s air section specially 1Interface Specifications it is bus of all is lines subflooring, normally removed 5. A definition (including crating specifiéations): conditioning, or into not secured for out of the outside world. If it is to the device with no other external unless some shlpment or connected special reguired unit a by which standard IO connections, that fact may controller and its simply be noted. The connection between a devices must be detailed; diagrams are particularly helpful. 6. Master Drawing List A master drawing list for electrical the umit is required, both and mechanical. The print set must include: 6.1 Functional block diagram 6.2 Flow chart, timing diagram 6.3 UML with optional modules (if any)} clearly indicated 6.4 Power 6.5 Bus 6.6 Mechanical 6.7 Cable schedule of 7. wiring layout diagram all 6.8 Block 6.9 1Interface list nonstandard (include detailed connectors). schematics description. System Components A of basic list and y system components inclwding: \ \ \ ; description PDP~X Technical Memorandum # 5 (Continued) 7,1 Modules Power controls Cables Vendor-supplied 8, equipment, Checkout Specifications % A list of all test to bz run on assembled system and the required results, Includes voltage and timing margins to be taken, duration of tests, and any other aggravation tests required, 8.1 Specification Tegt of relevant equipment Diagnostic test required P eguipment, : , Programs System Programs Marginal Check Power Supply Vibration 8.2 Diagnostic Stick programs All diagnostics must run successfully. Program name Program number Running time These include: Coments: | } : ! fi y : System programs Several systems programs which are in the library and have been proven operaticnal smust be run suc' cessfully, Program Program name number Comments: (Continued) 'PDP—XvTechnical Memorandum #5 Voltage Margins high temperature is Time Nunmber Rack | 7 +10 spec . ; " cold i \ H i —-15 spec hot , cold! hot S { % i = °C i AR it i A L A e e P TS Programn - - Table v wa T, SR 8.4 8.5 9. Vibration and other aggravation test specs Acceptance Test Procedures 9.1 Incoming test on vendor egquipment 9.2 The procedure to be followed by the field representative ‘before cludes a a of list check tests specifications, 9.2.1 system shipment. This in- for proper documentation supplied, to be performed with acceptance etc. Check for the presence of all itemg listed on the Accessory Check List 9.3 service (Sec. 9.3). 9.2.2 Diagnostics and System Pr@grams'to be run. 9.2.3 Margin spot check. 9.2.4 Shipping check. Accessory Check List 9.4 Test egquipment required for 9.21 9.5 Special test procedures for fieI@:iQstalled options.. v 'PDP—X,Technical Memorandum # 5 10. (Continued) A list of all spare parts reguired, including: 10.1 Modules - 10.2 Components, esp. 10.3 Mechanical parts 10.4 Special tools semiconductors / i 11. : | Preventative Maintenance : | . Procedures The procedures to be followed by the customer or field service representative units. This electrical etc. includes to or mechanical The procedures Daily 11.2 Weekly 11.3 Monthly 11.4 reiiable operation adjustments should be broken including: 11.1 insure clearing tape heads, Semi-annually of the changing filters, running monthly margins, down into categories
Home
Privacy and Data
Site structure and layout ©2025 Majenko Technologies