This document outlines the quarterly maintenance procedure for cleaning and verifying the alignment of RK05 Disk Drives within the Fuel Handling system.
The procedure includes the following key steps:
- Cleaning and Inspection: Involves obtaining work authorization, halting the processor, cleaning the prefilter, inspecting the drive interior for damage or wear, and examining the read/write heads for contamination.
- Power Supply Checks: Verifies that the +5.0 Vdc, +15.0 Vdc, and -15.0 Vdc regulators are operating within specified tolerances, checking for ripple, and performing adjustments as necessary.
- Head Alignment Checks: Describes the process for checking and aligning the top and bottom heads to ensure the readback signal is within 6% error, using an oscilloscope and the ALIGNX diagnostic program.
- Index/Sector Timing Checks: Ensures the timing pulses occur within defined tolerances, with provisions for adjusting timing on the PCB or relocating the sector transducer if required.
The document concludes with post-maintenance requirements, such as reinstalling disks, restarting the computer systems, and filing necessary reports. It also provides reference attachments including a diagram of the G180 PCB and a backplane layout.