DECsystem 5900 Dual CPU Drawer Installation Manual

Order Number: EK-DECDU-IN

This document, the "DECsystem 5900 Dual CPU Drawer Installation Manual," provides detailed, step-by-step instructions for installing a second CPU drawer to upgrade a DECsystem 5900 server to a dual CPU configuration.

It is specifically intended for use by Digital Services engineers or authorized self-maintenance customers.

The manual covers the entire installation process, including:

  • Unpacking the upgrade kit and its components.
  • Preparing the system by powering it down, removing filler panels, and relocating the original cable arm.
  • Assembling and attaching new drawer slides and installing a new cable arm.
  • Physically installing the new CPU drawer, with warnings about requiring two people and extending the stabilizer bar for balance.
  • Connecting necessary cables, including power, system console, and TURBOchannel connections.
  • Guidance on powering up the system and performing acceptance tests (Power-Up Self-Test, system configuration checks, and extended ROM tests).
  • Information on modifying the ULTRIX operating system and configuring mass storage drawers/SCSI IDs, if required as a result of the upgrade.
EK-DECDU-IN-A01
June 1992
40 pages
Quality

Original
1.4MB

Site structure and layout ©2025 Majenko Technologies