This document outlines the quarterly maintenance procedure for RK05 Disk Drives used in fuel handling operations. The primary objective is to ensure the drives are operating correctly, power supplies are within specified limits, and the disk heads are properly aligned.
Key procedures include:
The document also provides specific safety cautions regarding potential high-voltage shorts, mechanical pinch points, and the extreme sensitivity of disk cartridges to contamination. Post-requisites include restarting the computer system, filing deficiency reports if issues are found, and signing off on the procedure. Attachments provide reference diagrams for the G180 PCB and the backplane layout.
Site structure and layout ©2025 Majenko Technologies