H7266 POWER REGULATOR INSTALLATION CARD

Order Number: EK-H7266-IN

This document provides a quick reference guide for installing a second H7266 power regulator in an AlphaServer 8200 system. It outlines the installation process in four main sections:

  1. Installation Preparation: Details steps like performing a system shutdown, removing the rear door, turning off the power regulator circuit breaker, and disconnecting the AC power cord.
  2. Installing the Power Regulator and AC Power Strip: Explains how to position mounting rails, attach mounting brackets, and install the AC power strip within the cabinet.
  3. Cabling: Provides instructions for connecting various cables, including the signal cable, 48 VDC cables, power jumper cable, current share cable, and regulator power cables.
  4. Final Steps: Covers setting circuit breakers to the "on" position, pressing the control panel's On/Off button, verifying operation by checking the MODULE OK LEDs, and replacing the rear door.
EK-H7266-IN
December 1995
Number of pages unknown
Quality

Original
39.3kB

Site structure and layout ©2025 Majenko Technologies