This document provides a quick reference guide for installing a second H7266 power regulator in an AlphaServer 8200 system. It outlines the installation process in four main sections:
- Installation Preparation: Details steps like performing a system shutdown, removing the rear door, turning off the power regulator circuit breaker, and disconnecting the AC power cord.
- Installing the Power Regulator and AC Power Strip: Explains how to position mounting rails, attach mounting brackets, and install the AC power strip within the cabinet.
- Cabling: Provides instructions for connecting various cables, including the signal cable, 48 VDC cables, power jumper cable, current share cable, and regulator power cables.
- Final Steps: Covers setting circuit breakers to the "on" position, pressing the control panel's On/Off button, verifying operation by checking the MODULE OK LEDs, and replacing the rear door.