Digital MultiSwitch 600 System Quick Start

Order Number: EK-DLSSM-QS

This document is a quick start guide for installing and configuring a Digital MultiSwitch 600 Stack System. It outlines six key procedures: planning the installation, installing the first module (Stack Director), installing additional levels (Stack Stations), cabling the Stack Director and Stack Stations, connecting power, and assigning an IP address to the Stack Director.

Key steps include attaching mounting trays, inserting Stack Interconnect Cards, properly seating and securing Stack Stations, connecting a setup device (PC or terminal) with specific settings, and managing various network connections like 10Base2, Management Access, and out-of-band management. The guide emphasizes correct power connection, grounding, and verifying power status with LEDs. Finally, it provides instructions for navigating the system's installation menu to configure in-band and out-of-band IP addresses, subnet masks, and gateway addresses for the Stack Director. For detailed instructions and safety information, it refers users to the full installation and configuration manual.

EK-DLSSM-QS
December 1997
Number of pages unknown
Quality

Original
18.0kB
EK-DLSSM-QS
December 1997
Number of pages unknown
Quality

Original
18.5kB

Site structure and layout ©2025 Majenko Technologies