This manual provides instructions for installing, configuring, and managing the Digital MultiStack System Stacking Unit, which enables the creation of fully-managed Ethernet networks. The system supports up to 16 Digital 90-series modules (such as repeater hubs, access servers, bridges, and routers) in physical, distributed, or rack/cabinet configurations.
Key features include:
Installation involves unpacking the components, setting a unique position identifier for each stackable hub, connecting ThinWire cables for the data network and UTP cables for the management channel, connecting the power supply, and setting up the management agent. Operation can be verified using LED indicators on the units and the HUBwatch GUI. Troubleshooting guidance focuses on interpreting LED statuses and ensuring proper cable connections.
Site structure and layout ©2025 Majenko Technologies