This Field Change Order (FCO 9XXX-0012), released on January 13, 1992, addresses a manufacturing and field reliability issue affecting VAX 9000-210, 410/420, 430, and 440 systems shipped prior to June/October 1991.
The problem identified is the difficulty in assembling capacitors to buss bars, which causes severe overheating during the manufacturing process and leads to subsequent field failures.
The solution varies by system model:
The installation is estimated to take 1.0 hour and requires a field service maintenance tool kit and a 9/16" deep socket wrench. The document provides detailed installation procedures for both Model 4xx and Model 210 systems, including system shutdown, power disconnection, removal of old components, installation of the new parts, and reassembly. Field engineers are instructed to report the activity on a LARS form. The necessary material for this FCO is provided free of charge to customers.