This document is a comprehensive guide for manufacturing and field personnel, as well as resellers, on configuring and installing AlphaServer 4000/4100 systems in both cabinet and pedestal configurations.
The manual covers:
- Configuration Rules: Detailed guidelines for cabinets, pedestals, system drawers (AlphaServer 4000 and 4100 specifics), StorageWorks shelves, and power systems, including component placement for stability and cooling.
- Preparation: Instructions for preparing the cabinet and pedestal, including environmental and power requirements, unpacking, removing from pallets, stabilization, and joining multiple cabinets.
- Installation: Step-by-step procedures for installing components within the cabinet, such as slider rails, system drawers, and StorageWorks shelves.
- Connections: Guidance on connecting essential peripherals and cables, including serial terminals, graphics monitors, remote console monitors, Ethernet cables, and StorageWorks shelves.
- Power-Up and Verification: Procedures for system power-up, checking test results (including control panel messages and module LEDs), troubleshooting power-up failures, using
show commands for configuration and power status, performing preboot tasks (setting environment variables, running ECU, updating firmware), and booting various operating systems (OpenVMS, Digital UNIX, Windows NT).
- Appendices: Additional information on converting a system drawer from a cabinet unit to a pedestal unit, and specific instructions for using H9A10-EC (metric) cabinets.