StorageWorks SW800 Series Cable Distribution Unit Installation

Order Number: EK-SWCDU-IS

This document, the "StorageWorks SW800 Series Data Center Cabinet Cable Distribution Unit Installation Guide," provides instructions for two main procedures related to the StorageWorks SW800 data center cabinet:

  1. Replacing Cable Distribution Units (CDUs): This section details the step-by-step process for removing an existing CDU and installing a replacement unit. It includes parts lists for both 60 Hz and 50 Hz kits, safety warnings, and instructions for system shutdown, disconnection, physical replacement, reconnection, and system restart.
  2. Installing the Dual Power Option: This section outlines the procedure for adding a dual power capability to the cabinet, which involves installing a second CDU (designated as CDU B) and its associated power cabling. It provides parts lists for 60 Hz and 50 Hz dual power kits, safety warnings, and detailed steps for system preparation, CDU B installation, optional filler panel installation, crucial cable and cabinet labeling, and connecting new power sources.

The guide emphasizes safety precautions and provides comprehensive, sequential instructions for these hardware installation and replacement tasks.

EK-SWCDU-IS-A01
October 1993
10 pages
Quality

Original
0.3MB
EK-SWCDU-IS
December 1993
Number of pages unknown
Quality

Original
0.4MB

Site structure and layout ©2025 Majenko Technologies