This document, the "StorageWorks SH043-Series Cabinet Installation and User's Guide" (Order Number: EK-SH043-IG. A01), provides comprehensive instructions for the installation, configuration, and use of StorageWorks SH043-series cabinets. It is primarily intended for qualified service personnel.
Key areas covered include:
- An overview of the SH043-series cabinet's major components and its various power configuration options (single cabinet, dual shelf, and dual cabinet setups).
- Detailed site preparation guidelines, addressing power requirements, floor loading, and equipment grounding.
- Procedures for unpacking the cabinet, removing it from its shipping pallet, leveling, and initial powering.
- Configuring the cabinet for either storage-only or controller/storage applications, including specific shelf and TZLX-series tape drive locations.
- Installation instructions for StorageWorks shelves and TZLX-series tape drives, along with the management of filler panels and air separation panels to ensure proper airflow and FCC compliance.
- Guidance on SCSI-2 signal cabling and routing rules within the cabinet.
- Information on environmental stabilization of equipment.
The manual specifically details mechanical cabinet configuration and power configuration, while referring to other StorageWorks documentation for in-depth information on SCSI-2 signal bus configuration and connection.