StorageWorks Solutions 5 1/2-inch SBB Half-Height Install Gde

Order Number: EK-SBB55-IG

This document, the "StorageWorks Solutions 5¼-Inch SBB Half-Height Device Installation Guide," provides step-by-step instructions for installing a second 5¼-inch half-height (HH) device (such as a CD-ROM or tape drive) into a StorageWorks Building Block (SBB).

The guide emphasizes precautions against electrostatic discharge (ESD) and outlines the following key procedures:

  1. Preparation: Verifying the components of the second 5¼-inch half-height option kit and removing the SBB's bezel and top cover.
  2. Device Mounting: Attaching the new HH device to a mounting bracket, ensuring proper alignment and securing it with screws.
  3. Device Alignment: Carefully aligning the second device with the first device within the SBB's bottom cover guide slots.
  4. Connections: Attaching the SCSI ID flex circuit, folding the appropriate I/O cable (with specific instructions for tape drives and CD-ROMs), and connecting the 50-pin interface, 4-pin power, and SCSI ID connectors to the device.
  5. Reassembly: Re-inserting the mounted device, positioning backplane connectors, snapping the SBB's top and bottom covers into place, and reattaching the bezel.
EK-SBB55-IG-B01
March 1994
17 pages
Quality

Original
0.1MB
EK-SBB55-IG
December 1994
Number of pages unknown
Quality

Original
0.2MB

Site structure and layout ©2025 Majenko Technologies